{"id":"01KK9Y6YNKTPMX55BPV9CTEA6E","cid":"bafkreidyafjo2a65vztz7x7vpzaydgp6djku3azqk6tk3cercdufkinywm","type":"infrastructure_component","properties":{"_kg_layer":0,"description":"A part of the Vieques airport that is planned for extension through land provision.","label":"airport runway","purpose":"extend airport capabilities","type":"infrastructure component"},"relationships":[{"peer":"01KK9Y2K039TVA9C38W98GY03Q","peer_type":"collection","predicate":"collection"},{"peer":"01KK9Y6ZR9ZJ322DKHH454GTBQ","peer_label":"measures to address past wrongs","predicate":"is_part_of","properties":{"description":"Providing land to extend the airport runway is a measure to improve infrastructure and address past wrongs.","source":{"id":"01KK9Y5Q520N4R4XDP3C3FP4NX","label":"Page 14","type":"file"},"source_text":"providing land to extend the airport runway"}},{"peer":"01KK9Y5Q520N4R4XDP3C3FP4NX","peer_label":"Page 14","predicate":"extracted_from","properties":{"extracted_at":"2026-03-09T18:37:09.415Z","source":{"id":"01KK9Y5Q520N4R4XDP3C3FP4NX","label":"Page 14","type":"file"}}},{"peer":"01KK9Y671W327RDDTPNYZK9VXS","peer_type":"klados_log","predicate":"log_output"},{"peer":"01KK9Y742TATJFM1SE0PW8J0JQ","peer_type":"klados_log","predicate":"log_input"},{"peer":"01KK9Y742TATJFM1SE0PW8J0JQ","peer_type":"klados_log","predicate":"log_output"}],"ver":5,"created_at":"2026-03-09T18:37:06.611Z","ts":"2026-03-09T18:37:58.775Z","edited_by":{"method":"system","user_id":"01KJ60WNDBKP1GS1XSMJQ9F1AR"}}