{"id":"01KJVJ0YPN9F2KHZ8QFHB9M1AE","cid":"bafkreibzzxkt7ap3kop5scfy36fjenrupchvghzplfjwbgiaaih6acxrpa","type":"infrastructure_project","properties":{"_kg_layer":0,"action":"extend","asset":"airport runway","description":"A project involving providing land to extend the airport runway on Vieques, part of broader improvement measures.","label":"airport runway extension","purpose":"extend runway","resource_provided":"land"},"relationships":[{"peer":"01KJVHYR8BPQCJWPRP3VJWRWHN","peer_type":"collection","predicate":"collection"},{"peer":"01KJVJ092FED9V05DPN3W7WGS4","peer_label":"Vieques","predicate":"part_of_measures_for","properties":{"description":"The provision of land for extending the airport runway is a measure implemented to improve infrastructure and address community needs in Vieques.","source":{"id":"01KJVHZ7ZGBSQNZ60T0CR4VQR8","label":"Page 22","type":"file"},"source_text":"providing land to extend the airport runway"}},{"peer":"01KJVHZ7ZGBSQNZ60T0CR4VQR8","peer_label":"Page 22","predicate":"extracted_from","properties":{"extracted_at":"2026-03-04T04:34:47.258Z","source":{"id":"01KJVHZ7ZGBSQNZ60T0CR4VQR8","label":"Page 22","type":"file"}}},{"peer":"01KJVJ092FED9V05DPN3W7WGS4","peer_label":"Vieques","predicate":"referenced_by","properties":{"context":"is subject to","source":{"id":"01KJVK3W65BHEK7TDKDQJ0NNZJ","label":"Page 7","type":"file"},"source_text":"providing land to extend the airport runway"}},{"peer":"01KJVK3W65BHEK7TDKDQJ0NNZJ","peer_label":"Page 7","predicate":"extracted_from","properties":{"extracted_at":"2026-03-04T04:54:38.402Z","source":{"id":"01KJVK3W65BHEK7TDKDQJ0NNZJ","label":"Page 7","type":"file"}}}],"ver":3,"created_at":"2026-03-04T04:34:45.077Z","ts":"2026-03-04T04:54:39.089Z","edited_by":{"method":"system","user_id":"01KJ60XQBHJ0GBGTP9X8HXAPPM"}}